
A complete closure of the bridge on the border between Romania and Bulgaria
The road-rail bridge over the Danube connecting Giurgiu (Romania) and Ruse (Bulgaria) will be closed on March 27, starting from 9:00 AM. During the closure is required to enable concreting spaces between new road panels.
The bridge will be reopened to car traffic the same day at 12:00, but drivers of HGVs will have to wait until 9:00 AM on March 28. All drivers are advised to plan their route in advance to avoid traffic jams and long waits near the bridge.
Latest Posts
Easter truck driving bans in Poland. One provision makes the difference
During the Easter period in Poland, additional traffic bans apply to trucks with a gross vehicle weight exceeding 12 tonnes. The restrictions will cover...
Romania will shut down the toll system. Drivers will not be able to buy a vignette
CNAIR has announced a planned technical interruption that will affect the ability to purchase vignettes and pay road tolls in Romania.On Wednesday, April 8,...
Major disruptions ahead in Germany – A2 motorway closed, A4 with night closures
April brings significant disruptions on German motorways. According to Die Autobahn GmbH des Bundes, the A2 motorway in Dortmund will be completely closed...